This week I have been out 4 days to see the progress they are making, and got some pictures in daylight. The secure windows are in place and 2 of the 5 door frames are complete. The walls have been built up and every room is secure with seperate/private entrances to each. All of the electric work is complete with the exception of faces on the light switches and power receptacles. This will be done as soon as all the walls are smoothed. About half of the walls are smoothed now, so I see myself moving in by November 30. I have packed my room in Leon and am ready to get out there as soon as possible.

Sergio has been overseeing the whole project, and has some of the church men and youth aged boys helping a friend of his from Leon lay the block and mix cement. The bakery is being built off the back of the house using what was the kitchen of the pastor's house to connect the youth house and the new structure that goes all the way to the border of the property. The walls of the bakery are about 16 feet tall and within the next week the metal purlinies should be in place to start attaching the roof.
No comments:
Post a Comment